Site Photo Record

Capsule-style unit positioned on supports in an outdoor setting

Site Photo Record

A capsule house site photo checklist should create a dated, traceable visual baseline of the unit, access route, working area, supports or foundations, utility interfaces, drainage, obstructions and nearby conditions before installation begins. Each image needs enough context to show what, where and when it records.

Photographs support coordination but do not prove design adequacy, dimensions, capacity, approval or safety. The responsible project professionals must inspect and release technical work using approved information.

Plan the Record Before Taking Photos

Identify the project, date, site area, unit, photographer and current drawing or plan reference. Use a simple shot list and consistent location names. Preserve original files and avoid edits that remove important context.

Capture Context Before Detail

Start with orientation views showing the approach, delivery and lifting areas, final unit position and surrounding work. Then take closer images of interfaces, identifiers and visible conditions. A close-up without a location reference can be difficult to use later.

Pre-Installation Photo Register

Photo groupRecordControl question
OrientationSite approach, work area and final positionCan the viewer locate the work?
AccessGate, route, turning area and obstructionsIs current access visible?
SupportsReference points, interfaces and visible conditionIs the exact location identified?
ServicesUtility routes, terminations and protectionCan interfaces be coordinated?
UnitIdentifier, condition and stored accessoriesIs the installed unit traceable?

Record Access, Drainage and Obstructions

Photograph current surfaces, edges, slopes, water paths, overhead features, temporary works and nearby activities from safe positions. Link observations to the responsible review instead of declaring the route or setup suitable.

Connect Photos to Controlled Documents

Reference relevant items from the foundation inputs checklist, site storage record and lift-day release. State when a photograph shows an open issue, temporary condition or superseded arrangement.

Close the Installation Handoff

Store images in a controlled folder with filenames or register numbers that preserve sequence. Record missing views, inaccessible areas and changes after the photo date. The installation guide provides wider process context.

To request available product-side interface information, contact Rovellc with the selected configuration, destination and project stage.