Drainage Interface Handoff

Capsule house foundation illustrating drainage interface coordination

Drainage Interface Handoff

A capsule house drainage interface handoff records the product outlet reference, proposed site connection, elevation information, open constraints and responsible parties. It helps the supplier, civil and installation teams avoid gaps at the building-to-site boundary.

Qualified designers and local authorities control drainage design, sizing, gradients, discharge, testing and acceptance. This handoff is a coordination record, not engineering advice.

Fix the Interface Reference

Record the project, unit, drawing revision, outlet identifier, survey datum, site route reference and parties responsible on each side of the interface.

Build the Handoff

FieldRecordQuestion
OutletID, location and drawingIs it traceable?
LevelApproved datum and measured referenceWho verified it?
RouteSite connection and accessWhat remains open?
ResponsibilitySupplier, civil and installer scopeIs the boundary explicit?
ReleaseReviewer, evidence and statusMay connection proceed?

Separate Coordination from Design Approval

Do not treat a marked location or measurement as approval of the site system. Route discrepancies through the project RFI and hold affected work until an authorized response is recorded.

Close the Interface

Retain the final revision, survey or test reference, exception closeout and release decision with the installation record.

Use the utility connection matrix to define responsibilities and the post-rain drainage record for operating observations. Contact Rovellc for available product-side interface information.