03 Nov Drainage Interface Handoff
A capsule house drainage interface handoff records the product outlet reference, proposed site connection, elevation information, open constraints and responsible parties. It helps the supplier, civil and installation teams avoid gaps at the building-to-site boundary.
Qualified designers and local authorities control drainage design, sizing, gradients, discharge, testing and acceptance. This handoff is a coordination record, not engineering advice.
Fix the Interface Reference
Record the project, unit, drawing revision, outlet identifier, survey datum, site route reference and parties responsible on each side of the interface.
Build the Handoff
| Field | Record | Question |
|---|---|---|
| Outlet | ID, location and drawing | Is it traceable? |
| Level | Approved datum and measured reference | Who verified it? |
| Route | Site connection and access | What remains open? |
| Responsibility | Supplier, civil and installer scope | Is the boundary explicit? |
| Release | Reviewer, evidence and status | May connection proceed? |
Separate Coordination from Design Approval
Do not treat a marked location or measurement as approval of the site system. Route discrepancies through the project RFI and hold affected work until an authorized response is recorded.
Close the Interface
Retain the final revision, survey or test reference, exception closeout and release decision with the installation record.
Use the utility connection matrix to define responsibilities and the post-rain drainage record for operating observations. Contact Rovellc for available product-side interface information.